logo
Cart
HomeManufacturers
Yageo(国巨)
country/region:Taiwan, China
Application:
consumer electronicsIndustrial applicationsPower and energyAutomotive electronicsmedical

Founded in 1977, Yageo Corporation has become a world-class passive component service provider with operations around the world, including manufacturing plants and sales departments in Asia, Europe and the Americas. The company is uniquely positioned to provide a one-stop shopping service, offering a complete portfolio of resistors, capacitors, inductors and high-frequency solutions, including both commodity and specialty-grade versions, as well as co-design capabilities, distribution, electronics Business connections and logistics. Yageo is currently ranked 1st in the world for chip resistors, 3rd for MLCCs and 3rd for ferrite products. Yageo Corporation has 20 sales offices, 8 manufacturing locations and 3 R&D centers worldwide.

Type:PDN
Time:2023-05-08
Change:Obsolescence Notices
No.:PCN- 100000498, Rev A
Description:End Of Life Notice. No replacements provided.
Model:HM2154HLT
Type:PCN
Time:2023-02-20
Change:Assembly Process,Characteristics Change
No.:PCN-100000480 Rev. A
Description:1. Use new header to fit the laser process. (depth is increased) 2. Split the center tip wire to two inner pins (better soldering) 3. Insulation layer laser stripping to replace pre-tinning process 4. Auto coil winding to replace manual coil winding
Model:PU3921
Type:PCN
Time:2023-02-08
Change:Marking
No.:EBR-0176-22070801
Description:To eliminate Laser marking of Shunt resistor PU3921–implementation
Model:HM1193NLT
Type:PCN
Time:2022-09-22
Change:Assembly Site,Test Site
No.:PCN-100000435 Rev. B
Description:Pulse would like to move all of backend processes (Inspection, testing and packing to Pulse owned factory (MPO) and add the production site as second sourcing.
Model:HM1193NLT
Type:PCN
Time:2022-09-22
Change:Assembly Site,Test Site
No.:PCN-100000435 Rev. B
Description:1. In order to improve automotive parts quality level and the business contingency strategy, Pulse would like to move all of backend processes (Inspection, testing and packing to Pulse owned factory (MPO) and add the production site as second sourcing. 2. No impact to product form, fit and function. Product process and BOM remain the same.
Model:HM2103NLT
Type:PCN
Time:2022-09-22
Change:Assembly Site,Test Site
No.:PCN-100000435 Rev. B
Description:1. In order to improve automotive parts quality level and the business contingency strategy, Pulse would like to move all of backend processes (Inspection, testing and packing to Pulse owned factory (MPO) and add the production site as second sourcing. 2. No impact to product form, fit and function. Product process and BOM remain the same.
Model:HM2147NLT
Type:PCN
Time:2022-09-22
Change:Assembly Site,Test Site
No.:PCN-100000435 Rev. B
Description:1. In order to improve automotive parts quality level and the business contingency strategy, Pulse would like to move all of backend processes (Inspection, testing and packing to Pulse owned factory (MPO) and add the production site as second sourcing. 2. No impact to product form, fit and function. Product process and BOM remain the same.
Type:PCN
Time:2022-09-22
Change:Assembly Site,Test Site
No.:PCN-100000435 Rev. B
Description:Pulse would like to move all of backend processes (Inspection, testing and packing to Pulse owned factory (MPO) and add the production site as second sourcing.
Type:PCN
Time:2022-09-22
Change:Assembly Site,Test Site
No.:PCN-100000435 Rev. B
Description:1. In order to improve automotive parts quality level and the business contingency strategy, Pulse would like to move all of backend processes (Inspection, testing and packing to Pulse owned factory (MPO) and add the production site as second sourcing. 2. No impact to product form, fit and function. Product process and BOM remain the same.
Type:PCN
Time:2022-09-22
Change:Assembly Site,Test Site
No.:PCN-100000435 Rev. B
Description:Pulse would like to move all of backend processes (Inspection, testing and packing to Pulse owned factory (MPO) and add the production site as second sourcing.
RFQ
Log in to see more benefits!